Izmit Integrated Environmental Project - River Improvement
-
Client
Izmit Metropolitan Municipality
-
Project information
- Clinical and Hazardous Waste Incineration and Power
- Generation Plant(35,000 tons/year)
- Wastewater Collectors
- Domestic and Industrial Solid Waste Sanitary Landfill (4,000,000m3)
- Izmit-Eastern Part Domestic and Industrial Wastewater Treatment Plant
- River Rehabilitation
- DM 464,179,190 (Consortium)
- 56.80% Veziroğlu Group 43.20% Lurgi
- Excavation : 311,500 m3
- Fill : 350,000 m3
- Geotextile : 382,000 m2
- Pile (Ø650 mm): 3,300 m
Rivers become heavily polluted in 1980s due to rapid increase in population and indiscriminate discharges from industrial, commercial, livestock and domestic sources.
- Environmental improvement works for rivers
- Dredging, drying and storing regularly of the active sludge deposited on riverbeds.
- Major and minor engineering works includes improvements to the river channel by concrete lining and cladding of slopes by precast elements.