• Infrastructure Projects

  • Some of Infrastructure Projects Executed by Veziroğlu Group

  • Project information

    - İzmit Wastewater Collector
    - Marmaris Wastewater Collector, Sewerage Network System & Stormwater Collection System
    - Didim Wastewater Network and Collector System
    - Bolu City Construction of Sewerage System
    - Kırıkkale City Construction of Sewerage System
    - Milas Collector and Connections to Collectors Project
    - Great Ankara Sewerage and Stormwater Project Construction of Lower Interceptor Box Culvert
    - Eryaman IV. Stage Mass Housing Area B9 Region Roads Infrastructure and Landscaping Works
    - Kızılay-Atatürk Bulvarı and Güvenlik Region Wastewater and Stormwater Collector Construction
    - Eryaman III. Stage Mass Housing Area B9 Region Roads Infrastructure and Landscaping Works
    - Bursa Water Supply and Sewerage Construction Project

    Type of Pipes
    - Concrete pipes
    - Reinforced concrete pipes
    - Prestressed concrete pipes
    - Asbestos cement pipes
    - Steel pipes in pressurized lines
    - Diameter of Pipes: Ø150-Ø1400
    - Length of Pipes: 818,000 m
    - Pile (Ø650 mm): 31,000 m

The water distribution system delivers potable water to the residents of the area. The goals of the system is to provide uninterrupted water flow at adequate pressures, to meet all industrial and domestic flow requirements, and to minimize water loss of the system due to leakage