• Didim Wastewater Treatment Project

  • Client

    Didim Municipality

  • Project information

    - Capacity : 40,000 m3/day
    - System : Activated Sludge System

Increasing demands on wastewater quality and increasing wastewater load with limited land necessiates a better control of wastewater and optimization of wastewater treatment plants