-
Didim Wastewater Treatment Project
-
Client
Didim Municipality
-
Project information
- Capacity : 40,000 m3/day
- System : Activated Sludge System
Increasing demands on wastewater quality and increasing wastewater load with limited land necessiates a better control of wastewater and optimization of wastewater treatment plants